Construction & temporary power
Plan continuous load, start-up peaks, connections and working hours before selecting a mobile system.
UNITED KINGDOM · PROFESSIONAL PORTABLE POWER
For construction teams, mobile workshops and critical work where the mains is unavailable or unreliable. Start with your actual load, required runtime and charging route.
01 · APPLICATION
Plan continuous load, start-up peaks, connections and working hours before selecting a mobile system.
Keep tools, chargers and service work moving without treating every device in the vehicle as simultaneous load.
Separate critical equipment from non-critical load and define how energy will be restored after use.
02 · TECHNICAL BRIEF
List the equipment that runs at the same time and its continuous power requirement.
Record the highest start-up peak from motors, pumps, compressors or chargers.
Confirm the required runtime, charging opportunity and actual site connection conditions.
03 · SYSTEMS
Send your load list, location and required hours. We will discuss a practical energy configuration.
3,600 W · 3,430 WhDL // BP3600Ideal for: Service work, mobile workshops, backup and off-grid use
A compact 3,430 Wh LiFePO4 Power Station with 3,600 W output and up to 2,000 W PV input.
6,000 W · 5,376 WhDL // EP6000ILIdeal for: Tools, service vehicles, rental and mobile workshops
The EP6000iLS combines 5,376 Wh LiFePO4 storage with up to 6,000 W rated output at 120–240 V and documented AC and PV charging options.
THREE-PHASE · 7,680 WhDL // EP12000ILIdeal for: Three-phase machinery, construction sites, industry and temporary power
A professional 7,680 Wh LiFePO4 Power Station with 12,000 W / VA rated three-phase output and documented configurable charging for construction, industry and temporary power.
04 · SCOPE
Availability, delivery, connector configuration and regulatory requirements are assessed per product and application.
Request a purchase quote or discuss hire availability separately; equipment, delivery, VAT and lead time are confirmed per application.
Connector, mains, protection and site-integration requirements must be checked against the model documentation and your site conditions.
05 · NEXT STEP
Send your load list, location and required hours. We will discuss a practical energy configuration.
Request a UK technical quoteDRIVELONG EU
Availability, delivery, connector configuration and regulatory requirements are assessed per product and application.