Construction site power
Use the real simultaneous load as the starting point, not the highest single wattage on site.
IRELAND · PROFESSIONAL PORTABLE POWER
Map the equipment, site conditions and required autonomy before choosing a professional portable energy system for work in Ireland.
01 · APPLICATION
Use the real simultaneous load as the starting point, not the highest single wattage on site.
Define what needs to operate together, how long the job lasts and where the system can recharge.
Identify the equipment that cannot wait during a power interruption before sizing the configuration.
02 · TECHNICAL BRIEF
Share each device, its wattage and the period it runs.
State whether 230 V, three-phase or specific connectors are required.
Confirm the Republic of Ireland delivery location, access and required support scope.
03 · SYSTEMS
Tell us what needs to remain powered and where the work takes place.
2,400 W · 2,662 WhDL // BP2400Ideal for: Service work, small mobile workplaces, backup and compact off-grid use
A compact 2,662 Wh LiFePO4 Power Station with 2,400 W output for service work and autonomous use.
5,000 W · 3,430 WhDL // EP5000ILIdeal for: Mobile workshops, service, construction, backup and off-grid use with higher peak loads
The EP5000iL combines 3,430 Wh LiFePO4 storage with 5,000 W / VA rated output, 10,000 W / VA peak output and configurable AC, PV and optional charging routes.
THREE-PHASE · 7,680 WhDL // EP12000ILIdeal for: Three-phase machinery, construction sites, industry and temporary power
A professional 7,680 Wh LiFePO4 Power Station with 12,000 W / VA rated three-phase output and documented configurable charging for construction, industry and temporary power.
04 · SCOPE
Do not treat a portable system as a substitute for site electrical design or competent connection advice.
Purchase and hire requests are assessed separately, including actual delivery, VAT, collection and return conditions.
Transport, battery handling and electrical site requirements depend on the model and the work environment.
05 · NEXT STEP
Tell us what needs to remain powered and where the work takes place.
Request an Ireland technical quoteDRIVELONG EU
Do not treat a portable system as a substitute for site electrical design or competent connection advice.