TEMPORARY CONSTRUCTION POWER

Construction site power without a grid connection, matched to your work.

Keep tools, lighting and temporary work areas running while grid power is unavailable, pending or unreliable.

EP12000iL Drivelong EU
12 kWEP12000iL

01 · BELASTING EERST

Start with the load on your site.

A mobile energy setup works only when simultaneous consumption, start-up peaks, phase requirements and required runtime are clear in advance. This prevents the highest wattage alone from driving the choice.

02 · CONTROLEPUNTEN

Three checks before you choose

Map what runs at the same time and its continuous output.

Record the highest start-up peak from motors, pumps or compressors.

Define runtime, connections and available charging opportunities.

03 · SYSTEEMKEUZE

Systems for temporary construction power

Compare your actual load with the available systems. We assess three-phase and higher-output applications in advance.

Calculate runtime

04 · IN DE PRAKTIJK

Practical site checks

Tools & installation

Focus on simultaneous use; adding separate output figures is not always enough when inrush current is involved.

Lighting & facilities

Plan for actual working hours and a reserve for a changing construction schedule.

Phase & protection

Have phase distribution, cable selection and final connection technically assessed.

05 · FAQ

Temporary construction power: FAQs

Bring your site load. We will translate it into a practical mobile energy system.